1/25/21 Capital Project Update

1/25/21 Capital Project Update
Posted on 01/25/2021
Work the Week of 1/18/2020 - 1/22/2020

Phase 2
Edger –Substantially complete.
Boland’s – Substantially Complete.
Brosh– Substantially Complete.
Knapp – Substantially Complete.
Siracusa - Substantially Complete.
Day - Substantially Complete.

Phase 3
FAHS –   
Nelcorp - Misc. Punch List, stage floor light installation/connections & intrusion wiring.
Siracusa - Misc. Punch lists.
Syracuse Scenery - Waiting until in-person meetings are again permissible to schedule final audio training.
Boland’s –
Day-  Working on programing and punch lists.

Phase 4
FAHS –  Substantially Complete.
Schuler Hass – Substantially Complete.
Petcosky- Substantially Complete

TURF Interior
Petcosky  – Art Room Sink installed.
Edger - Remaining casework and counters (Epoxy factory closed due to Covid temp. Plastic Laminate Tops) installed. Floor painted. Auditorium wing stairs terrazzo materials scheduled to ship by the end of the week.
John  Mills Electric- Fire Alarm Devices and power to HVAC equipment and in area to be mounted.
Day - Provided damper for exhaust fan to Petcosky.

Work the Week of 1/25/2020 - 1/29/2020

Phase 2
Edger –Substantially complete.
Boland’s – Substantially Complete.
Brosh– Substantially Complete.
Knapp – Substantially Complete.
Siracusa - Substantially Complete.
Day - Substantially Complete.

Phase 3
FAHS –   
Nelcorp - Misc. Punch List and intrusion wiring.
Siracusa - Misc. Punch lists.
Syracuse Scenery - Sound Punch List items being addressed on Thursday.  Waiting until in-person meetings are again permissible to schedule final audio training.
Boland’s –
Day-  Working on programing and punch lists.

Phase 4
FAHS –  Substantially Complete.  Waiting for small terrazzo infills at Freeville.
Schuler Hass –Substantially Complete.
Petcosky- Substantially Complete

TURF Interior
Petcosky  – Startup for HVAC Equipment.  Prep for Cabinet unit installation on west side of Auditorium Lobby (starting Wed.).
Edger - Final finishes and paint touchup in Darkroom. Auditorium wing stairs terrazzo materials scheduled to be on site Monday with approximate a 1 week installation.
John  Mills Electric- Fire Alarm Devices and power to HVAC equipment and in area to be mounted.
Day - Controls connections